Distribution Center, Taicang
Returns a list of
Client: Taicang Andreas Stihl Power Tools Co., Ltd.
Site Location: Taicang
Design and Construction Period: 11/2012-12/2014
Land Area: 20,259 m²
Building Area: 45,050 m²
Building Volume: approx.200,000 m³
Contract Model: EPCM Service