New Production Factory, Liaoning
Returns a list of
Client: Volkswagen Automatic Transmission (Dalian) Co., Ltd.
Site Location: Dalian, Liaoning Province
Design and Construction Period: 07/2018 - 05/2019
Land Area: 79,921 m²
Building Area: 51,886.25 m²
Building Volume: 518,862.5 m³
Contract Model: EPCM Service