Release time:2019-02-01Hits:1171 次
Returns a list ofJust 4 years after SoP of the initial Phase 1, Engel/Wintec in Changzhou started the next Extension Stage. Additional 20,000 sqm production and technical areas will be realized - based on a foundation of more than 30km of PHC Piles, just finished these days. The Project will be realized again to the standards and specs which are applying worldwide to all Engel Facilities. Optimised energy concepts are an integral part of this philosophy, which is met with geothermal heating/cooling, solar energy and a comprising BMS System, integrating all systems/construction stages. As long-standing partner of Engel over many years, all Engineering and Project Management Services are entrusted to BMP Shanghai.