1 /
AP Winner Chemicial Technology (Changzhou) Co., LTd.

Distribution Center, Changzhou

Returns a list of

Client: AP Winner Chemicial Technology (Changzhou) Co., LTd.
Site Location: Changzhou
Design and Construction Period: 01/2012-15/2013
Land Area: 49,928 m²
Building Area: 8,134 m²
Building Volume: 63,149 m³
Contract Model: EPCM Service